Austin, Texas, is home to one of Senior Quality Lifestyles Corporation’s luxurious senior living communities, The Querencia at Barton Creek. This 38-acre campus encompasses residences, a pool, art gallery, bistro dining and a multi-use fitness center. Their quality of living and resident care recently won recognition as a Masterpiece Living Certified Center for Successful Aging. Chamberlin’s Querencia Balcony Repair project included waterproofing and restoring the exterior balconies and windows to rejuvenate the prestigious life care community and will continue to serve the facilities and their residents for years to come.
While installing nearly 190,000 square feet of waterproofing products, Chamberlin met challenges such as terrain obstacles, unknown conditions and time constraints. This scope was completed in 20 months with a total contract amount of nearly $5,700,000. Teamwork, innovation and proactive planning gained this project the 2018 Associated Builders and Contractors of Central Texas Merit Award. This level of achievement qualifies Chamberlin's work on Querencia for the 2018 National Excellence in Construction Award.
Unexpected Turns
As Chamberlin began their waterproofing scope, crews discovered damage and deterioration in the wooden balcony decks. French Engineering, a specialty engineering firm with 30 years of national consulting experience, investigated the issue and went to work to find a solution. They issued supplemental sketches detailing the resolution, and Chamberlin executed the plan. Glulam beams in the decks of four stacks of balconies were so severely rotted that they needed to be completely demolished and rebuilt. After demolition, only the skeleton of steel beams remained in place. Since there was no deck left to stand on, a plan was created to allow crews to safely install the new decking while being tied off 100% of the time. Crew members working from scaffolding surrounding the balcony framework used multiple anchor points depending on their access point, such as the top of the building and the balcony structure above. Additionally, the balconies’ framework was shored to prevent any possibility of the structure collapsing, as crew members had to move about on the steel beams as well. Despite the additional scope, Chamberlin was determined to keep on track and had up to 50 crew members working at
Creating a Direct Path
To minimize disruption, Chamberlin’s on-site job trailer and parking location for the crew was located on the opposite end of the 38-acre campus from the residential facilities. In between the jobsite and the trailer were hiking trails for the residents and a beautiful landscape of trees, valleys and creeks. This terrain made it difficult to reach further areas of the jobsite. Chamberlin was approved to utilize other paths and entrances to reduce mobilization time to and from the jobsite trailer and material storage yard. Since the terrain is rather hilly, the walk from the jobsite to the trailer approximated 10-15 minutes. Using a van to shuttle crew members to and from the jobsite saved up to ten man-hours per day in production time. This also allowed Schropp to be readily available to observe, oversee and mentor the crew when needed within minutes from the on-site trailer. Furthermore, the material storage area was made out of crushed limestone called caliche that is biodegradable and will break down on its own over time.
On Time, On Budget
Quality is Key
French Engineering and Chamberlin worked together on quality control to successfully deliver watertight balconies with a refreshed look for The Querencia at Barton Creek. Each week, the engineering consultant conducted quality assurance inspections and Chamberlin completed any outstanding items discovered. This process was noted in reports exchanged between the engineering consultant and contractor, totaling 75 throughout the course of the project. In addition, Chamberlin conducted their own daily quality control inspections to be proactive and meet the owner’s needs. In the end, The Querencia representatives were extremely pleased with Chamberlin’s quality work delivered professionally in a timely manner.